Recherche
  Home Actualités Petites annonces Offres d’emploi Appels d’offres Publireportages C'est vous qui le dites Medias & tendances Immobilier Recherche Contact



Infos congo - Actualités Congo - 08 Mars 2024
mediacongo
Retour

Ouvrages

Les mesures de sauvegardes Environnementales et Sociales (COVID-19 DRC)

2020-03-26
26.03.2020
Ouvrages
2020-03-26
Ajouter aux favoris
http://www.mediacongo.net/dpics/filesmanager/jobaof/2020/03-mars/04/pdss_200326_1_04.jpg -

Government of the Democratic Republic of Congo/Ministry of Health
DRC COVID-19 Strategic Preparedness and Response Project (P173825)

ENVIRONMENTAL and SOCIAL
COMMITMENT PLAN (ESCP)

March 24, 2020

 

ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN

1. The Democratic Republic of Congo (hereinafter the Recipient) will implement the DRC COVID-19 Strategic Preparedness and Response Project (the Project), with the involvement of the following ministries/agencies/units: Ministry of Health/the Health System Strengthening for Better Maternal and Child Health Results Project (PDSS) project implementation unit. The International Development Association (the Association) has agreed to provide financing for the Project. 

2. The Recipient will implement material measures and actions so that the Project is implemented in accordance with the Environmental and Social Standards (ESSs). This Environmental and Social Commitment Plan (ESCP) sets out material measures and actions, any specific documents or plans, as well as the timing for each of these. 

3. The Recipient is responsible for compliance with all requirements of the ESCP even when implementation of specific measures and actions is conducted by the Ministry, agency or unit referenced in 1. above. 

4. Implementation of the material measures and actions set out in this ESCP will be monitored and reported to the Association by the Recipient as required by the ESCP and the conditions of the legal agreement, and the Association will monitor and assess progress and completion of the material measures and actions throughout implementation of the Project. 

5. As agreed by the Association and the Recipient, this ESCP may be revised from time to time during Project implementation, to reflect adaptive management of Project changes and unforeseen circumstances or in response to assessment of Project performance conducted under the ESCP itself. In such circumstances, the Recipient will agree to the changes with the Association and will update the ESCP to reflect such changes. Agreement on changes to the ESCP will be documented through the exchange of letters signed between the Association and the Recipient. The Recipient will promptly disclose the updated ESCP. 

6. Where Project changes, unforeseen circumstances, or Project performance result in changes to the risks and impacts during Project implementation, the Recipient shall provide additional funds, if needed, to implement actions and measures to address such risks and impacts.

01. Click here to download the Environment-and-Social-Commitment-Plan - PDF Format

02. Click here to download the Stakeholder-Engagement-Plan - PDF Format


PDSS
right
Article suivant Confiné à Paris, Valérien Mulangu Tshishi publie l'ouvrage "Histoires étonnantes du Congo"
left
Article précédent Plan d’action en faveur des Populations Autochtones : Maï-ndombe - Zone de santé de Pendjwa

Les plus commentés

Afrique Insécurité dans l'Est de la RDC : Kagame exige à Tshisekedi de revenir sur ses propos d'attaquer le Rwanda avant de le rencontrer !

25.03.2024, 32 commentaires

Afrique La compromission de Luanda : Kinshasa reconnaît les FDLR, Kigali se frotte les mains

25.03.2024, 7 commentaires

Politique Agression rwandaise : « Un jour d’une manière ou d’une autre, tout ceci s’arrêtera » (Félix Tshisekedi)

26.03.2024, 7 commentaires

Afrique Pour Paul Kagame, l’armée sud-africaine ne devrait pas combattre le M23 « qui défend ses droits »

27.03.2024, 7 commentaires

Ils nous font confiance

Infos congo - Actualités Congo - confiance